Free nationwide shipping on qualifying pieces, plus clear delivery details before you buy.

JUSTONE INTERIOR

Vesgantti 105" Mid-Century Modern Sofa, Beige

$745.54
Contiguous U.S. Ships FreeFree shipping on all orders within the continental U.S. No minimum purchase. Delivery timing and assembly vary by item.

Elevate your space with the Valenwood 105” Mid-Century Modern Sofa in a soft beige finish. This generously sized four-seater blends timeless mid-century lines with contemporary comfort. Upholstered in smooth beige fabric and anchored by solid wood legs, it brings a light, neutral elegance to your space. Whether placed in a modern living room, office, or stylish lounge, the Valenwood’s calming tone and inviting silhouette make it a refined centerpiece for any interior.

Key Features

  • Expansive 105” length ideal for spacious seating

  • Olive green fabric brings natural warmth to your room

  • Mid-century modern silhouette with clean lines

  • Sturdy corner-blocked wood frame for lasting support

  • Solid wood legs offer elevated durability and style

  • Easy-to-follow assembly included

Dimensions

  • Overall: 104.72”L x 40.94”W x 30.71”H

  • Weight: 165 lbs

  • Seating Capacity: 4

Specifications

 

  • Style: Mid-Century Modern

  • Material: Fabric upholstery, wood frame, solid wood legs

  • Color: Olive Beige

  • Assembly Required: Yes

  • Origin: China

 

Product details

Product details

Style
Mid-Century Modern
Color
Shades of Beige
Delivery
Ships Free

Ask Finn

Will this work in my room?

Guided furniture help
Ask Finn about dimensions, style, material, room fit, or everyday use.